War Memorial Stadium Field Preparation - Photo Gallery

June 21, 2005

LARAMIE, Wyo. -

The project is on schedule. Foundations for the goal posts have been poured. The contractor is pouring the concrete aprons on each side of the field for the trench drains and starting to install the underground drain piping. Two new entrances to the stadium are being prepared on the east side, as well as a new entry ramp into the student section from the southeast corner.